Hi, I have configured OCM to run PY's logic from PD environment with 2 methods :
objective : Login to PD and use PD data but the logic must be from PY....
THe reason why i do this is all user failed to do confirm -shipment P4205 in PD environment but succeeded in PY...now still in question mark was that caused by PD data or PD logic...
Open OCM - system 900
method 1 :
1. Copy JPY default object for objec type : UBE, XAPI, RTE, BSFN into JPD path code for specific user only Eg, khwong ; so that only this user can use PY logic
then activated the new sets for this userID khwong...
can this method work ? Login to PD and the user khwong can use PY ;s logic ? I tested it and worked but after restarted servers..it failed again... any reason why ?
method 2 :
1. copy JPY default name for object type TBLE for specifc user - change to business data -prod then activated....
2. copy JPY control table - crp for object type TBLE for specific user - change to control table - prod (around 80+ records) and then activated
login to PY with this userID...it can point to PD 's data
Hope that helps...
No comments:
Post a Comment